其它知识 2023-06-20
某公司向银行借款23000元,借款期限为9年,每年的还本付息额为4600元,则借款利率为()%:
A.6.53
B.13.72
C.7.68
D.8.25
A
China and countries along the B&R routes are making efforts to promote()infrastructure construction and operation management.The impact of climate change has been taken into full account on any constructions.
类别: 题库 | 2024-01-12
()is the priority on the agenda of the B&R.
Chengdu-Europe Express Railway is the highlight of China Railway Express。
The six corridors build a bridge for the Asian economic circle and the European economic circle.They have played an important role in strengthening connectivity between countries and()an efficient and smooth Eurasian market.
According to the BRI, comprehensive transport system along the B&R routes has been greatly enhanced via specific fields like().
()is committed to installation, operation and maintenance of the communication infrastructures.
In May 2017, on the first BRF for international cooperation, President Xi sai
Countries along B&R are rich in energy resources with()of remaining proved natural gas reserve of the world total.
Energy projects have been built in over()countries since the proposal of BRI.
More than 2,000 years ago, a trade route dubbed the “()” promoted exchanges between Sichuan Province and Southeast as well as central Asian countries.